Drill & Blast Services
Our trained and experienced working team will provide total drilling and blasting solutions to all our clients. Since no single client or project is ever the same, we have skills in various drilling and blasting techniques, methods and products, all ensuring that the job gets done in line with the client specifications and exceeds their expectations.
Rock Blasting Using Explosives
- Tunnel Blasting 1
- Tunnel Blasting 2
- Shaft Blasting 1
- Shaft Blasting 2
- Open Blasting
- Controlled Blasting
- Trench Blasting
- Underwater Blasting
Rock / Concrete Breaking Using NoneX™ Safety Chemical Cartridges
- Breaking of Rock on Hillslope 1
- Breaking of Rock on Hillslope 2
- Breaking Rock Outcrop in Trench 1
- Breaking Rock Outcrop in Trench 2
- Breaking Rock Outcrop in Tunnel 1
- Breaking Rock Outcrop in Tunnel 2
- Breaking Of Rock Outcrop In Construction Site
- Breaking Of Reinforced Concrete Structures 1
- Breaking Of Reinforced Concrete Structures 2
Rock / Concrete Breaking Using Manual Splitting Method
- Breaking Of Rock Outcrop In Construction Site
- Breaking Of Boulders
- Breaking Of Reinforced Concrete Slab
- Breaking Of Reinforced Concrete Wall
Tunnel Blasting 1
Jurong Island Rock Cavern Phase 1A Gallery
Tunnel Blasting 2
Jurong Island Rock Cavern Phase 1A Gallery
Shaft Blasting 1
Jurong Island Rock Cavern Phase 1A Shaft Sinking
Shaft Blasting 2
Jurong Island Rock Cavern Phase 1A Shaft Sinking
Open Blasting
Marsiling Sports School
Controlled Blasting
Condominium Construction
Trench Blasting
Water Pipeline Laying At Mandai
Underwater Blasting
Reclamation For Pasir Panjang Terminal Phase 3 & 4
Breaking Of Rock Outcrop At Hill Slope 1
Advance Earthwork For Downtown Line Depot Stage 2
Breaking Of Rock Outcrop At Hill Slope 2
Advance Earthwork For Downtown Line Depot Stage 2
Breaking Of Rock Outcrop In Trench 1
NeWater Pipeline Infrastructure Plan, KJE
Breaking Of Rock Outcrop In Trench 2
NeWater Pipeline Infrastructure Plan, BKE
Breaking Of Rock Outcrop In Tunnel 1
Water Pipeline Laying At Kranji
Breaking Of Rock Outcrop In Tunnel 2
Water Pipeline Laying At Kranji
Breaking Of Rock Outcrop In Construction Site
Circle Line, NUS Station
Breaking Of Reinforced Concrete Structures 1
Circle Line, One-North Station
Breaking Of Reinforced Concrete Structures 2
Circle Line, Lorong Chuan Station
Breaking Of Rock Outcrop In Construction Site
Hotel Basement Construction
Breaking Of Boulders
Hotel Basement Construction
Breaking Of Reinforced Concrete Slab
Circle Line, Tai Seng Station
Breaking Of Reinforced Concrete Wall
Circle Line, Dhoby Ghaut Station
Featured Project

Reclamation For Pasir Panjang Terminal Phases 3 & 4
October 2009 - PresentThis huge project is running at 24 hours non-stop, including drilling and blasting. Blasting is to be conducted twice a day, in an approved blasting window. Explosives usage is relatively high compared to land controlled blasting.
Downloads(PDF) - Safety Data Sheet
- Tenaga Kimia - Explosives - Emulex ® - Package / Cartridge
- Tenaga Kimia - Explosives - Bulk Emulsion - E1000LD Gassed
- Tenaga Kimia - Explosives - Bulk Emulsion - E1000LD Ungassed
- Tenaga Kimia - Explosives - Bulk Emulsion - E1000UG Gassed
- Tenaga Kimia - Explosives - Bulk Emulsion - E1000UG Ungassed
- Tenaga Kimia - Ensign Bickford - Non-Electric Detonators - NONEL® - Delay
- Tenaga Kimia - Detonating Cord
- Austin Powder - Electric Detonators - Delay
- YARA AB - Technical Ammonium Nitrate
- NoneX™ Safety Chemical Cartridge - UN0323
- NoneX™ Safety Chemical Cartridge - UN0432
HAVE A QUESTION FOR US?
CONTACT US
Co Reg No: 200209920H
25E Sungei Kadut Street 1
Singapore 729333
(Drill & Blast)
pyrotechnics@knights-synergy.com
(Fireworks & Pyrotechnics)
