Drill & Blast Services

Our trained and experienced working team will provide total drilling and blasting solutions to all our clients. Since no single client or project is ever the same, we have skills in various drilling and blasting techniques, methods and products, all ensuring that the job gets done in line with the client specifications and exceeds their expectations.

Rock Blasting Using Explosives

  • Tunnel Blasting 1
  • Tunnel Blasting 2
  • Shaft Blasting 1
  • Shaft Blasting 2
  • Open Blasting
  • Controlled Blasting
  • Trench Blasting
  • Underwater Blasting

Rock / Concrete Breaking Using NoneX™ Safety Chemical Cartridges

  • Breaking of Rock on Hillslope 1
  • Breaking of Rock on Hillslope 2
  • Breaking Rock Outcrop in Trench 1
  • Breaking Rock Outcrop in Trench 2
  • Breaking Rock Outcrop in Tunnel 1
  • Breaking Rock Outcrop in Tunnel 2
  • Breaking Of Rock Outcrop In Construction Site
  • Breaking Of Reinforced Concrete Structures 1
  • Breaking Of Reinforced Concrete Structures 2

Rock / Concrete Breaking Using Manual Splitting Method

  • Breaking Of Rock Outcrop In Construction Site
  • Breaking Of Boulders
  • Breaking Of Reinforced Concrete Slab
  • Breaking Of Reinforced Concrete Wall

Tunnel Blasting 1

Jurong Island Rock Cavern Phase 1A Gallery

Tunnel Blasting 2

Jurong Island Rock Cavern Phase 1A Gallery

Shaft Blasting 1

Jurong Island Rock Cavern Phase 1A Shaft Sinking

Shaft Blasting 2

Jurong Island Rock Cavern Phase 1A Shaft Sinking

Open Blasting

Marsiling Sports School

Controlled Blasting

Condominium Construction

Trench Blasting

Water Pipeline Laying At Mandai

Underwater Blasting

Reclamation For Pasir Panjang Terminal Phase 3 & 4

Breaking Of Rock Outcrop At Hill Slope 1

Advance Earthwork For Downtown Line Depot Stage 2

Breaking Of Rock Outcrop At Hill Slope 2

Advance Earthwork For Downtown Line Depot Stage 2

Breaking Of Rock Outcrop In Trench 1

NeWater Pipeline Infrastructure Plan, KJE

Breaking Of Rock Outcrop In Trench 2

NeWater Pipeline Infrastructure Plan, BKE

Breaking Of Rock Outcrop In Tunnel 1

Water Pipeline Laying At Kranji

Breaking Of Rock Outcrop In Tunnel 2

Water Pipeline Laying At Kranji

Breaking Of Rock Outcrop In Construction Site

Circle Line, NUS Station

Breaking Of Reinforced Concrete Structures 1

Circle Line, One-North Station

Breaking Of Reinforced Concrete Structures 2

Circle Line, Lorong Chuan Station

Breaking Of Rock Outcrop In Construction Site

Hotel Basement Construction

Breaking Of Boulders

Hotel Basement Construction

Breaking Of Reinforced Concrete Slab

Circle Line, Tai Seng Station

Breaking Of Reinforced Concrete Wall

Circle Line, Dhoby Ghaut Station

Featured Project

Reclamation For Pasir Panjang Terminal Phases 3 & 4

October 2009 - Present

This huge project is running at 24 hours non-stop, including drilling and blasting. Blasting is to be conducted twice a day, in an approved blasting window. Explosives usage is relatively high compared to land controlled blasting.

HAVE A QUESTION FOR US?
CONTACT US

Knights Synergy (S) Pte Ltd
Co Reg No: 200209920H
25E Sungei Kadut Street 1
Singapore 729333
+65 6368 2201, +65 6368 4310
+65 6861 9628
SUBMIT ONLINE ENQUIRY DISCOVER SOLUTIONS AHEAD